CardsofchangeCall (424) 561-9870

How to Get a Condo Repaint Approved by Your Santa Monica Board

How to Get a Condo Repaint Approved by Your Santa Monica Board

Nobody buys a condominium expecting to present a paint color to a committee. Then the trim goes chalky, or the stucco starts showing its cracks, and you find out that the wall outside your window is not yours to repaint. What follows is the process as it actually runs in Santa Monica buildings, written for an owner who wants the work done this year rather than next.

Who Owns the Wall

Start here, because everything else follows from it. In most condominium developments the exterior surfaces are common area, owned by the association and maintained by it. Your ownership typically begins at the inside face of the perimeter wall. Some documents grant an owner exclusive use of a balcony or a patio, which is a different thing again: you get the use of it, the association still owns the surface, and painting it usually still needs approval.

That means two separate questions. Is this surface even mine to touch, and if it is, does changing its appearance require written approval? In a great many Santa Monica buildings the answer to the second is yes regardless of the first, because architectural guidelines adopted under the governing documents cover anything visible from the common area or from the street.

Read the Documents Before You Read a Fan Deck

The declaration, usually called the CC and Rs, is the controlling document. Under it most associations have adopted architectural guidelines, and those are where the practical requirements live: what needs approval, what form to use, how many days the committee has to respond, and whether there is an approved palette you can pick from without a full review.

Find the sentence that applies to you and read it twice. If it is ambiguous, write to the board or the management company and ask, and keep the reply. A verbal yes from one director in the elevator is not an approval and will not protect you if the composition of the board changes.

If your building does have an adopted palette and you like one of the colors on it, stop reading. You do not need a submittal, you need a scope and a start date, and you have just saved yourself six weeks.

The Meeting Calendar Is the Real Schedule

Here is the part that surprises owners. The constraint on a condominium repaint is almost never the painter’s availability and almost never the drying time. It is that the architectural committee meets once a month, and everything you do or fail to do gets measured in meeting cycles.

A complete packet submitted with time to spare gets voted on at the next meeting. Call it four to six weeks from submission to a recorded decision. A packet that comes back for more information costs you a full cycle, and by the time you supply what was missing you may have missed the cut off for the following one as well. Two deferrals and a spring repaint has become an autumn repaint.

So the first thing to find out is not what colors are trending. It is what date the committee sits, and what its submission deadline is ahead of that date. Everything else gets planned backwards from there.

What a Complete Submittal Contains

The goal of the package is to make approval the easy option. A reviewer who has to imagine something, or who has an unanswered question, will vote to defer, because deferring is safe and approving on incomplete information is not.

Marked elevations. A drawing or a clear photograph of each face of the building, annotated to show which product and which finish goes on which surface. Stucco field, trim, fascia, doors, railings, stair stringers, soffits. This is the single item most often missing, and it is the item that stops the committee wondering whether the railings are meant to match the trim.

Product data sheets. The manufacturer’s sheet for every product named. It takes two minutes to download and it answers durability questions before anyone asks them.

Photographs of the drawdowns. More on these below. Shot on the building, in more than one light condition.

A written scope with the exclusions stated. What is being painted, in what order, and explicitly what is not. Boards care about the edges of a job. A scope that says the north elevation stucco and trim but not the balcony decking or the window frames gets read once and voted on. A scope that only lists what is included leaves the reviewer to guess about everything else.

The contractor’s insurance certificate, naming the association where the documents require it, and a proposed schedule with start and finish dates.

Many management companies also have a form of their own. Ask for it at the start. Filling out their form is faster than rewriting yours to match it.

Why Committees Defer

Outright refusal is rare. Deferral is the common outcome and it is almost always for one of four reasons.

The color cannot be judged from what was submitted. A printed chip stapled to a form, viewed indoors, is not enough information to approve a whole elevation and reasonable people know it.

The scope is unclear, so the committee cannot tell how far the work extends.

The proposal is out of step with the rest of the building or the block, and nobody wants to be the committee that approved the one house that does not fit.

Or the paperwork is simply incomplete: no insurance certificate, no data sheets, no schedule.

All four are avoidable in an afternoon of preparation.

Drawdowns Are the Part People Skip

A drawdown is a large sample of the actual paint, brushed onto the actual building. Not a chip, not a poster board leaned against the wall, though a board is better than nothing if the surface cannot be sampled. Sample on at least two elevations, because a color does not behave the same way facing the ocean as it does facing a neighbor’s hedge.

Then leave it up for about a week and look at it three times a day. In Santa Monica that matters more than it does inland, because the marine layer changes the light so completely. Under morning fog everything cools and flattens. At noon the glare washes out the mid tones. Late afternoon sun coming in low off the water warms every color noticeably, and a soft greige that looked expensive at lunchtime can go pink at five.

Photograph the samples in each of those conditions and put the photographs in the packet. A committee that has seen the color do that on its own wall has nothing left to imagine.

Sheen, and the Question Nobody Asks

Owners arrive with a color and no opinion on finish. Boards notice finish, because it is what determines whether the building looks tired in two years.

Flat hides surface irregularity, which is what you want on older troweled stucco with patch history, and it is the hardest surface to clean. Eggshell and satin buy you washability and start revealing every wave and repair in raking light. Semi gloss and gloss belong on trim, doors and metal railings, where they shed water and take a scrub.

Specifying satin across a wavy stucco field is a common mistake and an expensive one, because the only fix is another coat of something else.

Painting First and Asking Afterwards

It is worth being blunt about this. If you paint an approval requiring surface without approval, the association can require you to restore it at your own expense, and boards in this city do enforce that. The money is bad and the position it puts you in with your neighbors is worse.

If you painted to an approved submittal and the vote is recorded in the minutes, you are on firm ground even if the board turns over. Ask for the approval in writing, and check that it made the minutes.

Coastal Realities the Board Should Know

Two things about working near the water belong in your schedule and, ideally, in your submittal, because they explain a timeline that would otherwise look slow.

Surface temperature and dew point run the working day. A coat applied to a wall still damp from fog, or applied late enough that dew forms before the film sets, will blush, streak or fail to bond. A competent crew works the sunlit elevations first and stops earlier in the afternoon than a crew five miles inland would. That is not padding, it is the reason the coating lasts.

The other is that salt air and ultraviolet exposure are not evenly distributed across a building. South and west elevations fade first and fail first. A board reviewing a phased repaint should generally take those elevations first, not last, and phasing by elevation is a legitimate way to fit a full exterior into a reserve that will not cover it all in one year.

A Realistic Sequence

Six weeks before the meeting, read the documents and confirm what needs approval and on what form. Five weeks out, walk the building with your painter and settle the surface by surface specification. Four weeks out, get drawdowns on the wall. Three weeks out, photograph them across the day, assemble the packet and submit it ahead of the deadline. Then the meeting happens, the vote gets recorded, and work starts on a date you actually chose.

Skip the drawdowns and the same job takes twelve weeks instead of six, and you will have spent the difference waiting rather than painting.

Questions about your own building? Call Cardsofchange at (424) 561-9870. If all you need is a straight answer on whether your exterior needs a submittal at all, ask for that.

Need help in Santa Monica?

Call (424) 561-9870